INDUSTRIAL STRUCTURES

LOS ANGELES METRO 
RAIL PROJECT 
Los Angeles, California.
Main Shop Building is 400 feet
 by 500 feet
long industrial
building.  It also features
several bridge cranes.  The structure is part
of a project that has an
approximate construction
cost of $ 350 Million.
 
IN-N-OUT Burger Processing Plant
NASA Solid Rocket Processing Center IN-N-OUT BURGER 
PROCESSING PLANT 
Baldwin Park, California. 
A 90,000 square feet concrete tilt-up 
structure.  Approximate construction 
costs: $ 3 Million.

HAZARDOUS MATERIAL 
STORAGE AND AUXILLIARY 
BUILDINGS. 
Los Angeles, California.
Facilities for L.A. DPW at three sites. 
Approimate construction costs: 
$ 1.3 Million.     
SUNNY PLASTIC WAREHOUSE
Tamuning, Guam.
A two level Industrial
 Building.  The floors
and roof framing consist of
 precast
prestressed double tees and
beams. 
Approximate construction costs: $ 25 Million.

NASA SOLID ROCKET BOOSTER
PROCESSING /
ROTATION
FACILITIES
Kennedy Space Center, Florida. This project
consisted of threeseparate buildings. The main
building is 90 feet wide,
210 feet long and 100
feet high., high bay industrial building which

features two 200
ton bridge cranes. 
Approximate construction
costs:
$ 10 Million.
L.A. DPW



  Copyright 1997 by E & A Engineers, Inc.
All Rights Reserved
Created 5/27/97